Go to main content of the website
0466 600 700Book

Aquatic area

On site

Our new aquatic area (built in 2023) is composed of : 

- A heated pool*

Opening date: June 30 to mid-September

 

For hygiene reasons, shorts and long clothing are not allowed for swimming.

The management reserves the right to close the aquatic area depending on the weather conditions.

* Pool heated by a heat pump, the water temperature depends on the outside temperature.

 

 

While our new pool is under construction:

Our campsite has a municipal aquatic area (paying) open July / August * located 100m away including:

- A heated outdoor swimming pool

- A paddling pool

- A toboggan

* The swimming pool being municipal, we cannot assure you of its opening dates

 

And for a well-deserved rest, many deckchairs, armchairs and parasols

 

** Photos are from the municipal swimming pool

app-window-clock